Prestressed concrete bridge design is one of my favorite topics — there's something satisfying about profiling tendons and watching the stress checks come out green. MIDAS Civil handles the full PSC workflow: tendon profiling, prestress loss calculation, and stress checks per AASHTO LRFD. Let me walk you through how I set up a PSC bridge design.
PSC Section Definition
Box Girder Section
- Model > Section > PSC Section
- Define box girder:
- Top slab width: 12.0m
- Top slab thickness: 250mm
- Bottom slab width: 6.0m
- Bottom slab thickness: 200mm (variable)
- Web thickness: 400mm (two webs)
- Total depth: 2.0m
- Fillets: 300×300mm at web-slab junctions
- Calculate section properties:
- Area (A), Centroid (yc), Moment of inertia (Iy, Iz)
- Section modulus (St = I/yc, Sb = I/(h-yc))
I-Girder Section
- Model > Section > PSC Section > I-Beam
- Define:
- Top flange width: 500mm
- Top flange thickness: 200mm
- Web thickness: 200mm
- Bottom flange width: 600mm
- Bottom flange thickness: 300mm
- Total height: 1800mm
Material Properties
- Model > Material
- Set:
- Concrete (girder): f'c = 40 MPa, f'ci = 35 MPa (at transfer)
- Concrete (deck): f'c = 30 MPa
- Prestressing strand: fpu = 1860 MPa, fpy = 1674 MPa (0.9 × fpu)
- Eps: 195,000 MPa
- Rebar: fy = 420 MPa
Tendon Profiling
Tendon Layout
- Load > Prestress > Tendon Profile
- Define tendon profile:
- Tendon type: Internal (bonded or unbonded) or external
- Number of tendons: e.g., 12 tendons
- Strands per tendon: e.g., 19 strands of 15.2mm diameter
- Tendon area: Ap = 19 × 140 = 2660 mm² per tendon
Tendon Geometry
- Define tendon path along the girder:
- Harparabolic profile: Most common for continuous girders
- Straight + harped: For simply supported girders
- Set control points:
- At supports: Tendon near top of section (negative moment region)
- At midspan: Tendon near bottom of section (positive moment region)
- Set eccentricity at each control point:
- At support: e = +800mm (above centroid)
- At midspan: e = -800mm (below centroid)
- MIDAS Civil generates smooth tendon profile
Tendon Stressing
- Load > Prestress > Stressing
- Set:
- Jacking stress: fpj = 0.75 × fpu = 1395 MPa
- Stressing method: Pre-tensioned or post-tensioned
- Stressing sequence: Both ends or one end
- Anchorage set: Slip = 6mm (typical for post-tensioned)
Prestress Loss Calculation
Immediate Losses
Elastic Shortening (ES)
- MIDAS Civil calculates:
- ΔfpES = Ep × Δfc/Eci
- Δfc: Change in concrete stress at tendon centroid due to prestress
- Eci: Modulus at transfer (lower than final Ec)
- For sequential stressing:
- First tendon: Full elastic shortening loss
- Last tendon: Zero elastic shortening loss
- Average: 50% of full loss
Anchorage Set Loss
- For post-tensioned tendons:
- ΔfpAS = (ΔL × Ep) / L
- ΔL: Anchorage slip (6mm typical)
- L: Tendon length
- Loss is highest at jacking end and decreases with distance
Friction Loss
- For post-tensioned tendons:
- ΔfpF = fpj × (1 - e^(-(μα + KL)))
- μ: Curvature friction coefficient (0.25 for steel ducts)
- α: Cumulative angle change (radians)
- K: Wobble friction coefficient (0.0017 per meter)
- L: Tendon length from jacking end
Long-Term Losses
Creep Loss (CR)
- MIDAS Civil calculates:
- ΔfpCR = Ep × εcreep = Ep × (φ(t,ta) × Δfc/Ec)
- φ(t,ta): Creep coefficient per ACI 209 or CEB-FIP
- Δfc: Sustained concrete stress at tendon level
- Creep loss develops over years (50% in 1 year, 100% in 30 years)
Shrinkage Loss (SH)
- MIDAS Civil calculates:
- ΔfpSH = Ep × εshrinkage
- εshrinkage: Per ACI 209 or CEB-FIP model
- Typical: 200-400 × 10⁻⁶
- Shrinkage loss develops over years
Relaxation Loss (RE)
- MIDAS Civil calculates:
- ΔfpRE = fpj × (log(t)/log(1000)) × RE_factor
- RE_factor: 1.5% for low-relaxation strand (per AASHTO 5.9.5.3.2b)
- t: Time in hours after stressing
- Relaxation is relatively small (2-3% of fpj)
Total Prestress Loss
- MIDAS Civil reports total loss per tendon:
- Immediate: ES + AS + Friction
- Long-term: CR + SH + RE
- Total: Immediate + Long-term
- Typical total loss: 15-25% of fpj
- Effective prestress: fpe = fpj - Total Loss
Stress Checks
At Transfer (Initial)
- Design > PSC Design > Stress Check > Transfer
- Check concrete stresses immediately after transfer:
- Compression (top): fc = Pi/Ag - Pi×e/St + Mdl/St
- Limit: 0.60 × f'ci (per AASHTO 5.9.4.1.1)
- Tension (bottom): ft = Pi/Ag + Pi×e/Sb - Mdl/Sb
- Limit: 0.24 × √f'ci (without bonded reinforcement)
- Limit: 0.58 × √f'ci (with bonded reinforcement)
- Compression (top): fc = Pi/Ag - Pi×e/St + Mdl/St
- If stresses exceed limits:
- Increase section size
- Reduce jacking stress
- Add temporary support
- Add reinforcement in tension zone
At Service (Final)
- Design > PSC Design > Stress Check > Service
- Check concrete stresses under full service loads:
- Compression (top): fc = Pe/Ag - Pe×e/St + (Mdl + Mll)/St
- Limit: 0.60 × f'c (per AASHTO 5.9.4.2.1)
- Tension (bottom): ft = Pe/Ag + Pe×e/Sb - (Mdl + Mll)/Sb
- Limit: 0.50 × √f'c (with bonded reinforcement and severe exposure)
- Limit: 0.58 × √f'c (with bonded reinforcement and moderate exposure)
- Compression (top): fc = Pe/Ag - Pe×e/St + (Mdl + Mll)/St
- If stresses exceed limits:
- Increase prestress force
- Add more tendons
- Increase section size
- Add non-prestressed reinforcement
Decompression Check
- For crack control:
- Verify that tendon stress does not exceed decompression stress
- Decompression: When concrete stress at tendon level reaches zero
- fpe + Δfp (due to live load) ≤ fpy (yield stress of strand)
Ultimate Strength Design
Flexural Strength
- Design > PSC Design > Flexural Strength
- MIDAS Civil calculates:
- Nominal moment (Mn):
- For rectangular section: Mn = Aps × fps × (dp - a/2)
- fps: Strand stress at ultimate (per AASHTO 5.7.3.1)
- a: Depth of equivalent stress block
- Factored moment (Mu): From load combinations
- Check: φMn ≥ Mu
- φ = 0.90 (tension-controlled)
- φ = 0.75 (compression-controlled)
- Nominal moment (Mn):
Shear Strength
- Design > PSC Design > Shear Strength
- MIDAS Civil calculates:
- Concrete shear (Vc): Per AASHTO 5.8.3.3
- Vc = 0.0316 × β × √f'c × bv × dv
- β: Per AASHTO 5.8.3.4.2
- Prestress contribution (Vp): Vertical component of tendon force
- Stirrup shear (Vs): Vs = Av × fy × dv / s
- Total: φVn = φ(Vc + Vp + Vs)
- Check: φVn ≥ Vu
- Concrete shear (Vc): Per AASHTO 5.8.3.3
Tendon Stress Distribution
- Results > Prestress > Tendon Stress
- View stress along each tendon:
- At jacking end: fpj (maximum)
- Along tendon: Decreasing due to friction
- At anchor end: fpj - friction loss
- After all losses: fpe (effective prestress)
- Verify all tendon stresses are within limits:
- fpj ≤ 0.75 × fpu (jacking)
- fpe ≥ 0.50 × fpu (after losses, minimum effective)
Camber and Deflection
Camber Calculation
- Results > Prestress > Camber
- MIDAS Civil calculates:
- Immediate camber: Due to prestress force (upward)
- Dead load deflection: Due to self-weight (downward)
- Net camber: Prestress camber - dead load deflection
- Long-term camber: Including creep multiplier (typically 2.0-3.0)
- Use camber for:
- Setting formwork elevation
- Providing upward camber to compensate for long-term deflection
Long-Term Deflection
- Results > Prestress > Long-Term Deflection
- View deflection over time:
- At transfer: Immediate (elastic)
- At 1 year: Including 50% creep and 70% shrinkage
- At 10 years: Including 90% creep and 95% shrinkage
- At 30 years: Including 100% creep and 100% shrinkage
- Check:
- Total deflection: ≤ L/240 (typical for PSC bridges)
- Live load deflection: ≤ L/800 (vehicular)
Wrapping Up
PSC bridge design in MIDAS Civil is comprehensive and well-organized. The thing I always emphasize: get your prestress losses right. The effective prestress after losses determines everything — stress checks, deflection, ultimate capacity. Don't just accept the default loss parameters; check them against your project's specifications. And always check stresses at transfer — that's when the concrete is youngest and weakest, and the prestress force is highest.
Source Verification
More Midas Civil Guides
workflow
MIDAS Civil Bridge Analysis: Modeling, Moving Loads, and Bridge Design per AASHTO and Eurocode
13 min read
workflow
MIDAS Civil Cable-Stayed Bridge Analysis: Form Finding, Cable Tuning, and Construction Control
12 min read
workflow
MIDAS Civil Construction Stage Analysis: Sequential Casting, Creep, and Camber Control
12 min read
workflow
MIDAS Civil Seismic Bridge Design: Ductility, Isolation, and AASHTO Seismic Provisions
12 min read
comparison
MIDAS Civil vs SAP2000: Bridge Analysis Platform Comparison for Bridge Engineers
11 min read
Related workflow Guides
Similar workflow content for other CAD tools
Abaqus
•workflow
Abaqus Composite Material Analysis: Laminate Modeling, Damage, and Progressive Failure
12 min read
Abaqus
•workflow
Abaqus Contact Mechanics: General Contact, Friction, and Wear Simulation
12 min read
Abaqus
•workflow
Abaqus/Explicit Dynamic Analysis: Crash, Drop Test, and High-Speed Impact Simulation
13 min read
Abaqus
•workflow
Abaqus Fracture Mechanics: XFEM, Cohesive Zone, and J-Integral for Crack Propagation
12 min read